The following are added to the Test Type & Test Perspective Catalog to determine test methods and acceptance criteria.

  • Review

Review

  • Test Method
    • Peer review of all deliverables
    • Merge is restricted by GitHub branch settings
    • Approval by at least one person and Resolved for all Conversations are merge requirements
  • Pass Criteria
    • All feedback has been addressed

Syntax check

Functional test

  • Test Method
  • Pass Criteria
    • All cases passed, 100% test coverage

Data compatibility test

Not applicable.

Business scenario test

This will be done in conjunction with functional test.

Configuration test

  • Test Method
  • Pass Criteria
    • All cases passed, 100% test coverage

Security test

Performance test

  • Test Method
    • Run for 1.5 hours with 10 people accessing the virtual space
    • The number of accesses will be secured by a test application
      • The test application will have no UI and only player operation will be performed
    • Visually determine the application's acceptance criteria using PC at hand
    • Application CPU usage/memory usage is monitored and data is used to determine acceptance criteria
  • Pass criteria
    • No frame dropping or stoppage of the application
    • CPU utilization/memory usage of the application must be within a certain range, and there must be no memory leaks or other problems

Stress test

This will be done in conjunction with performance test.

Volume test

Not applicable.

Long run test

This will be done in conjunction with performance test.

Failure test

  • Test Method
    • Manual Testing
      • Manually generate a failure event
    • test case
  • Pass Criteria
    • All cases passed

Operational scenario test

The following aspects have not yet been implemented as we do not operate in production.

  • Ability to start/stop servers according to procedures
  • Ability to recover from server failure according to procedures
  • Staff should be able to enter the application and monitor normal operation

Migration test

The following aspects have not yet been implemented as we do not release.

  • The next version and the current version must work in the production environment
  • The version upgrade is available

Current vs. new comparison test

Not applicable.

Usability test

Not implemented due to sample application.