The following are added to the Test Type & Test Perspective Catalog to determine test methods and acceptance criteria.

  • Review
  • Mobile Applications

Review

  • Test Method
    • Peer review of all deliverables
    • Merge is restricted by GitHub branch settings
    • Approval by at least one person and Resolved for all Conversations are merge requirements
  • Pass Criteria
    • All feedback has been addressed

Mobile Application

The following aspects are not yet implemented as they will be addressed in the future.

  • Behavior when an application transitions to/from the background or loses focus
  • Application memory usage (as each device has a limit on the amount of memory usage that an application can use)
  • Battery drain when using applications

Syntax check

Functional test

  • Test Method
  • Pass Criteria
    • All cases passed, 100% test coverage

Data compatibility test

Not applicable.

Business scenario test

This will be done in conjunction with functional test.

Configuration test

  • Test Method
    • Manual testing on Android, iOS and Win
    • Conducted with wired earphones with microphone
    • test case
  • Pass Criteria
    • All cases passed, 100% test coverage

Security test

Performance test

  • Test Method
    • Run for 1.5 hours with 90 people accessing the virtual space
    • The number of accesses will be secured by a test application
      • The test application will have no UI and only player operation will be performed
    • Visually determine the application's acceptance criteria using several devices at hand
    • The server monitors CPU utilization/memory usage and determines passing criteria based on the data
  • Pass criteria
    • No frame dropping or stoppage of the application
    • CPU utilization/memory usage of the multiplayer server must be within a certain range, and there must be no memory leaks or other problems

Stress test

This will be done in conjunction with performance test.

Volume test

Not applicable.

Long run test

This will be done in conjunction with performance test.

Failure test

  • Test Method
    • Manual Testing
      • Manually generate a failure event
    • test case
  • Pass Criteria
    • All cases passed

Operational scenario test

The following aspects have not yet been implemented as we do not operate in production.

  • Ability to start/stop servers according to procedures
  • Ability to recover from server failure according to procedures
  • Staff should be able to enter the application and monitor normal operation

Migration test

The following aspects have not yet been implemented as we do not release to the stores (Google Play, Apple Store).

  • The next version and the current version must work in the production environment
    • If released to the store, two versions must run in the production environment, one for review and the other for the current version
  • The version upgrade is available

Current vs. new comparison test

Not applicable.

Usability test